Skip navigation

SCR600 pick up / put down routine

Put down routine for port (N)

The table below shows the steps involved in the put down routine for a stylus module.


Operation

X-axis

Y-axis

Z-axis

Inhibit the probe

Clearance position

X(s)

Y(n)

0 mm

Move into docking target (SP600 loaded)

X

No change

No change

Detach stylus module

No change

No change

+8 mm (+0.31 in)

Exit port

X(s)

No change

No change


CAUTION: When performing a stylus module change with PH10 PLUS and SP600M, always lock and unlock in free space to ensure repeatability.

Picking up routine for SCR600 port (N)


Operation

X-axis

Y-axis

Z-axis

Clearance position

X(s)

Y(n)

+8 mm (+0.31 in)

Move into docking target (SP600 loaded)

X

No change

No change

Attach stylus module

No change

No change

0 mm

Exit port

X(s)

No change

No change

Activate the probe


X(s) = Safe position to start change cycle

Y(n) = Y axis position for port n

CAUTION: When using a SCR600 always load stylus modules automatically with the CMM and SP600.