Navigation
UCC BI references and associated documents
It is recommended that the following documentation is referenced when installing the UCC BI:
Renishaw documents
- Installation guide: UCC S5 REVO-2 CMM controller (H-1000-7598)
- Installation guide: SPA3-2 (H-1000-5364)
- Installation & user's guide: MCUlite-2, MCU5-2 and MCU W-2 (H-1000-5280)
- Installation guide: UCC T3 PLUS and UCC S3 CMM controller (H-1000-2118)
- Installation guide: UCC T3-2 (H-1000-5254)
- Installation guide: UCC T5 (H-1000-7573)
- Installation guide: SPA2-2 (H-1000-5247)
- Installation & user's guide: MCU (H-1000-5182)
- User guide: Product interconnection system (PICS) (H-1000-5000)
UCCassist-2 help | Found within UCCassist-2 |
External documents
National and international standards including the following may be applicable to the finished machine or installation:
- EN 60204-1:2006/A1:2009 (Safety of machinery - Electrical equipment of machines - Part 1: General requirements)
- BS EN 61010-1:2010 (Safety requirements for electrical equipment for measurement, control and laboratory use. General requirements)
- BS EN ISO 13849-1:2015 and BS EN ISO 13849-2:2008 (Safety of machinery. Safety-related parts of control systems)
- BS EN ISO 12100:2010 (Safety of machinery - General principles for design - Risk assessment and risk reduction)
It is the responsibility of the OEM or installer to ensure that the finished installation complies with applicable national regulations for the country of installation.