Educational article: (AP403) Productive Process Pattern: Critical feature reporting (pdf)
Productive Process Pattern™ from the post-process monitoring layer of the Productive Process Pyramid™. Select the critical features which are to be measured and reported, according to a set of criteria. Features should be reported where the failure of a feature would be indicative of a more serious process fault (e.g. the final feature machined with each tool); or when the position or dimension of a feature is dependent on other measured features or ‘in process’ calculations.
This type of file requires a viewer, freely available from Adobe
Other languages
中文(简体)Latest videos - Precision measurement and process control
Latest items - Precision measurement and process control
- Inspection cycles for Okuma machining centres when using an L-shaped stylus
- AxiSet™ Check-Up with auto update for Enshu machining centres
- Renishaw Product Terms
- Inspection Plus software for Versatech machining centres with Mazatrol Matrix and Smooth controllers
- Contact turning tool setting cycles for Heidenhain TNC 620/640 controllers
Didn't find what you were looking for?
Tell us what you couldn’t find and we will do our best to help.